City of Mankato
Work completed in 2008
Location: Mankato
GM Contracting has done several jobs for the City of Mankato in new construction, directional drilled, and reconstruct work. Some of the recent projects that involve directional drilling are Sumner Hills - Directional Drill new water, sewer & storm sewer through out the development (approx. 10000 LF of pipe from 1"-16"), Mankato Raw Water mains - Approx. 3000 FT of 24" ductile water main open cut with a 600 LF 30" HDPE River Crossing Drilled, Pearl & Beech Street - complete reconstruct of approx. 4 blocks of street and utility including 500 FT of 16" drilling for storm and sanitary, Harvest States Forcemain 8" force main HDD, Northside Lift Station 8" force main with 1000 LF HDD river crossing.