City of Plymouth - Raw Watermain Well #16
Work completed in 2008
Location: Plymouth
This was a raw water main project that connected a new well to the existing raw water main system. Work consisted of approx. 3200 LF of 18" pipe, most of which was directional drilled along with connections and restoration.
