City of Harrisburg SD – Phase II Force Main

This was a force main project that connected the City of Harrisburg to the Sioux Falls sanitary sewer system. Kempf Construction was the general contractor on this project and hired GM Contracintg to directional drill a portion of the force main. The force main was 16″ fusible PVC pipe.