CITY OF ORONO

GM Contracting, Inc. was the general contractor on this project which consisted of pipe reaming and upsizing 1,500 LF of an existing 8″ clay and truss pipe sewer main to a 14″ HDPE sewer main. Manhole sealing, bypasing and sewer service installation also was done.