City of Plymouth – Four Seasons Mall – Raw Watermain

This was a raw water main project that connected a new well to the existing raw water main system. Work consisted of approx 3,000 LF of 14″ pipe of which was directional drilled, along with connections and restoration. GM Contracting was the gerenal contractor on this project.